- JEMIMAトップページ
- お役立ち情報
- 国際標準化活動状況
- IEC規格ドラフトの審議情報
- IEC投票・審議文書台帳
IEC投票・審議文書台帳
直近 | SC3D | TC31 | TC44 | TC45 | TC65 | TC66 | TC77 | TC85 | TC111 |
IEC/SC3D 審議文書
文書配付日 | 規格番号 | 規格タイトル | 段階 | 投票期限 | IEC文書番号 |
---|---|---|---|---|---|
25-09-26 | IEC 61360-C00184 ED3 | Compilation of Comments on 3D/451/ED - IEC 61360-C00184 ED3: Switchgear and controlgear assembly objects for building information modelling | CC | 3D/459/CC | |
25-09-26 | Results of 3D/448/Q - Questionnaire to approve an update of the tasks of JWG 112 | RQ | 3D/461/RQ | ||
25-09-26 | IEC 61360-C00186 ED3 | IEC 61360-C00186 ED3: Replacement of Identification Blocks in IEC 61987 | VD | 25-11-07 | 3D/460/VD |
IEC/TC(SCs)31 審議文書
文書配付日 | 規格番号 | 規格タイトル | 段階 | 投票期限 | IEC文書番号 |
---|---|---|---|---|---|
25-09-26 | IEC TS 60079-32-1 ED2 | Review Report on IEC TS 60079-32-1 ED1: Explosive atmospheres - Part 32-1: Electrostatic hazards, guidance | RR | 31/1930/RR | |
25-09-26 | Result of 31/1897/Q: Nomination of Co-Convenor for MT 60079-46, Equipment assemblies | RQ | 31/1929/RQ | ||
25-09-26 | IEC 60079-32-2 ED2 | Review Report on IEC 60079-32-2 ED1: Explosive atmospheres - Part 32-2: Electrostatic hazards - Tests | RR | 31/1931/RR | |
25-09-26 | IEC 60079-26 ED5 | Compilation of Comments on 31/1873/CD - IEC 60079-26 ED5: Explosive atmospheres - Part 26: Equipment with Separation Elements or combined Levels of Protection | CC | 31/1932/CC | |
25-09-26 | TC 44 and TC 64 Liaison report to SC 31J plenary meeting, Norwood, USA | INF | 31J/409/INF | ||
25-09-26 | IEC SC61D Liaison report for the SC 31J plenary, Oct 2025, Norwood, USA | INF | 31J/407/INF | ||
25-09-26 | TC 18/MT 18 Liaison report to SC 31J plenary meeting, Norwood, USA | INF | 31J/408/INF | ||
25-09-26 | IEC 60079-10-1 ED4 | IEC 60079-10-1 ED4: Explosive atmospheres - Part 10-1: Classification of areas - Explosive gas atmospheres | CDV | 25-12-19 | 31J/396/CDV |
25-09-26 | ISO 80079-37 ED2 | Compilation of Comments on 31M/264/CD - ISO 80079-37 ED2: Explosive atmospheres - Part 37: Non-electrical equipment for explosive atmospheres - Non electrical type of protection constructional safety "c", control of ignition source "b", liquid immersion "k" | CC | 31M/284/CC | |
25-09-26 | ISO/IEC 80079-34 ED3 | Result of Voting on 31M/261/CDV - ISO/IEC 80079-34 ED3: Explosive atmospheres - Part 34: Application of quality management systems for Ex Product manufacture | RVC | 31M/285/RVC | |
25-09-26 | ISO 80079-36 ED2 | Compilation of Comments on 31M/263/CD - ISO 80079-36 ED2: Explosive atmospheres - Part 36: Non-electrical equipment for explosive atmospheres - Basic method and requirements | CC | 31M/283/CC |
IEC/TC(SCs)44 審議文書
文書配付日 | 規格番号 | 規格タイトル | 段階 | 投票期限 | IEC文書番号 |
---|
IEC/TC(SCs)45 審議文書
文書配付日 | 規格番号 | 規格タイトル | 段階 | 投票期限 | IEC文書番号 |
---|---|---|---|---|---|
25-09-26 | IEC 61577-6 ED1 | Result of Voting on 45B/1076/CDV - IEC 61577-6 ED1: Radiation protection instrumentation - Radon and radon decay product measuring instruments - Part 6: Passive integrating radon measurement systems using solid-state nuclear track detectors | RVC | 45B/1098/RVC |
IEC/TC(SCs)65 審議文書
文書配付日 | 規格番号 | 規格タイトル | 段階 | 投票期限 | IEC文書番号 |
---|---|---|---|---|---|
25-09-26 | IEC 62443-2-4 ED3 | Review report on IEC 62443-2-4:2023 ED2: Security for industrial automation and control systems - Part 2-4: Security program requirements for IACS service providers | RR | 65/1160/RR | |
25-09-26 | IEC 62443-4-1 ED2 | Review report on IEC 62443-4-1:2018 ED1: Security for industrial automation and control systems - Part 4-1: Secure product development lifecycle requirements | RR | 65/1159/RR | |
25-09-26 | IEC TS 63283-2 ED1 | IEC TS 63283-2 ED1: Industrial-process measurement, control and automation - Smart manufacturing - Part 2: Use cases | DTS | 25-11-21 | 65/1158/DTS |
25-09-26 | Questionnaire about addition of In-Cabinet SPE in CPF 2 as CP 2/4 (IEC 61784-x and IEC 61784-5-2) | Q | 25-11-07 | 65C/1366/Q | |
25-09-26 | Questionnaire about addition of AUTBUS PA and AUTBUS FA in CPF 22 as CP 22/2 and CP 22/3 respectively(IEC 61784-1 and IEC 61784-5-22) | Q | 25-11-07 | 65C/1367/Q | |
25-09-26 | Questionnaire for cancelation of IEC 62264-5 ED3 Project | Q | 25-11-07 | 65E/1193/Q | |
25-09-26 | IEC 62264-2 ED3 | IEC 62264-2 ED3: Enterprise-Control System Integration - Part 2: Object models and relationships for interfaces between manufacturing operations and business functions | 25-11-07 | 65E/1192/FDIS |
IEC/TC66 審議文書
文書配付日 | 規格番号 | 規格タイトル | 段階 | 投票期限 | IEC文書番号 |
---|
IEC/TC(SCs)77 審議文書
文書配付日 | 規格番号 | 規格タイトル | 段階 | 投票期限 | IEC文書番号 |
---|---|---|---|---|---|
25-09-26 | List of decisions taken at the plenary meeting of TC 77 held in New Delhi, India, on September 19th, 2025, from 9:00 IST to 12:48 IST | DL | 77/633/DL | ||
25-09-26 | IEC TR 61000-1-9/AMD1 ED1 | Review Report of IEC TR 61000-1-9:2024 ED1 | RR | 77A/1269/RR | |
25-09-26 | List of decisions taken at the plenary meeting of SC 77A held in New Delhi, India on 2025-09-16 | DL | 77A/1267/DL | ||
25-09-26 | Unconfirmed minutes of the meeting for the plenary meeting of SC 77A held in New Delhi, India on 2025-09-16 | RM | 77A/1266/RM | ||
25-09-26 | IEC 61000-4-30 ED4 | Result of Voting on 77A/1253/FDIS - IEC 61000-4-30 ED4: Electromagnetic compatibility (EMC) - Part 4-30: Testing and measurement techniques - Power quality measurement methods | RVD | 77A/1268/RVD | |
25-09-26 | List of decisions taken at the hybrid Plenary Meeting of SC 77C held in New Delhi, India, and via ZoomVideo-conferencing, from 18-09-2025 09:00 (UTC+5:30) to 18-09-2025 11:00 (UTC+5:30). | DL | 77C/355/DL |
IEC/TC85 審議文書
文書配付日 | 規格番号 | 規格タイトル | 段階 | 投票期限 | IEC文書番号 |
---|
IEC/TC111 審議文書
文書配付日 | 規格番号 | 規格タイトル | 段階 | 投票期限 | IEC文書番号 |
---|---|---|---|---|---|
25-09-26 | Decisions List related to physical meeting of TC 111 held in New Delhi on 18th - 19th of November 2025 | DL | 111/856/DL | ||
25-09-26 | PNW 111-855 ED1 | PNW 111-855 ED1: Digitalization of Carbon Footprint of Products (CFP) - Part 2: Format and Guidance for Exchanging CFP Data | NP | 25-12-19 | 111/855/NP |